美女视频黄频a在线视频久一区I91丨九色丨蝌蚪丨老版I天天玩夜夜操I影音先锋国产在线I日韩色资源I久久99精品国产麻豆婷婷I国产91精品一区二区I久久天堂AVI人人妻人人澡爽DVD盘锦I亚洲AV无码片久久精品I日本精品少妇I欧美性爽交A片大全秋霞I日本丰满熟妇一国产成人免费一I在线视频区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News Type
Exhibition News
Industry News
Company News
Media reports
 New Detail
     
Güdel Introduces ArcTrack, Preconfigured TMF for High-volume Robotic Welding-The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition
11/1/2017  Die-casting expo-foundry expo
---------------------------------------------------------------------------------------------------------------
    

Gudel introduces ArcTrack, a preconfigured robot track motion module for arc welding applications that delivers the highest flexibility and reduces lead time by 40 percent.

Güdel, the global manufacturer of linear motion modules, robot track motion units, gantry robots and components, introduces ArcTrack, a preconfigured robot track motion module for arc welding applications that delivers the highest flexibility and reduces lead time by 40 percent.

Güdel has pre-engineered a TrackMotion Floor (TMF-2) configuration with an auxiliary shelf to carry welding equipment, large wire spools and torch cleaning and reaming devices with the robot. The shelf is pre-engineered to support over 750 kg with no compromise in performance. The ArcTrack is available for all leading arc welding robots, including Fanuc, ABB, Motoman and KUKA, and includes robot-specific gear boxes, motors and cables.

All Güdel TrackMotion units are designed and engineered for harsh environments, including welding, painting, die cast, foundry, sealing, machining and grinding. Güdel’s unique cam follower and cartridge bearing design handle the worst environments, and enable 15-minute MTTR for bearing replacement. The ArcTrack is configured with guideway scrapers and a fully enclosed e-chain for the final layer of protection.

Güdel TrackMotion units, including the ArcTrack, are available in lengths from 3–100 meters, and can be equipped with robot risers from 50–600 mm. Because ArcTrack is a standard engineered solution, lead times are reduced to 8–10 weeks from order.

-The 19th Guangzhou Die-casting, Foundry & Industry Furnace Exhibition -Die-casting exhibition, Die-casting expo,2018 Die-casting exhibition, 2018 Die-casting expo, China Die-casting exhibition, China Die-casting expo, Foundry exhibition, Foundry expo, 2018 Foundry exhibition, 2018 Foundry expo, Industry Furnace exhibition, Industry Furnace expo, 2018 Industry Furnace exhibition, 2018 Industry Furnace expo, China Industry Furnace exhibition, China Industry Furnace expo

Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China