美女视频黄频a在线视频久一区I91丨九色丨蝌蚪丨老版I天天玩夜夜操I影音先锋国产在线I日韩色资源I久久99精品国产麻豆婷婷I国产91精品一区二区I久久天堂AVI人人妻人人澡爽DVD盘锦I亚洲AV无码片久久精品I日本精品少妇I欧美性爽交A片大全秋霞I日本丰满熟妇一国产成人免费一I在线视频区

Home AboutUs Exhibition
Info
News
Center
Exhibitor
Manual
Cost of
Participation
Floor
Plan
Exhibition
Retrospect
Media
Support
Contact Chinese
 News type
Exhibition News
Industry News
Company News
Media reports
 News detail
     
Galileo Resources to Apply for Mining Permit for Zambia zinc project-2020 China(Guangzhou)Int’l Metal & Metall
urgy Exhibition-metal exhibition

8/26/2019  金屬展-冶金展-鋼鐵展-steel expo-metal &metallurgy expo-
---------------------------------------------------------------------------------------------------------------
    Galileo Resources is set to apply for a mining permit for its Star Zinc Project near Lusaka, Zambia, after completing an initial inferred resource estimate that supported its initial estimates. The mineral resources estimate, prepared by Addison Mining Services, supported the assertion that the site contained 500,000 tonnes at 16% Zinc for 77,000 tonnes of contained metal above a cut-off grade of 2% Zinc, including approximately 340,000 tonnes at 21% Zinc for 72,000 tonnes of metal above a cut-off grade of 8%.

The AIM traded company said that the MRE, which defines a clear boundary between high-grade and low-grade zones, will allow for a six-year life-of-mine small scale operation to produce rock mass of only 5,500 tonnes per month containing 12,000 tonnes zinc metal per year to Jubilee Metals Group''s zinc process/refinery facility at Kabwe.

While in-house attributable revenues were projected at about USD 15 million annually at current prices and the annual all-in-cost was projected not to exceed to USD 2 million.

Mr Colin Bird, chief executive of Galileo, said that "The MRE clearly identifies an easy access near-surface mineable zone with a low stripping ratio of one to one. There will be no requirement for processing equipment other than possibly a mobile primary crusher. A low garade portion of the mineralised material remains an exploration target and may be amenable to preconcentrate/upgrade to about 10% Zn either as DSO or blending, pending further test work and method development." 金屬展-冶金展-2020廣州巨浪國際金屬暨冶金工業展覽會-亞洲最大金屬冶金展-巨浪展覽-2020 China(Guangzhou)Int’l Metal & Metallurgy Exhibition-metal exhibition -metal exhibition Metal exhibition, Metal expo, 2020 Metal exhibition, 2020 Metal expo, China Metal exhibition, China Metal expo, steel exhibition, steel expo, 2020 steel exhibition, 2020 steel expo, China steel exhibition, China steel expo
Copyright © 1996-2025  JULANG.COM.CN Stone Rich Sight. All Rights Reserved
Add:Room 3A05-3A06,Building A1,Xinghui Park,Huaming Road 29,Pearl River New City,Guangzhou,510623,China